What should you do if the original SWPPP is not kepted at the construction site?
| Copies of the BMP and maps/drawings shall be left with the field crew. |
What is an REAP? |
Rain Event Action Plan |
T or F: Diverting Run-On water is an allowed BMP. |
True. You can prevent stormwater contract with the construction site. |
T or F: SWPPP needs to be implemented only during the defined rain season. |
False, there is not defined rainy season as of Sept 2009 |
What are the five categories of year round BMPs? |
Housekeeping, non-stormwater mgt, erosion control, sediment control, run-on/run-off controls. |
Where in the permit are the minimum BMPs defined for LUPs? |
Attachment A |
Where in the permit are the minimum BMPs defined for Risk Level 1? |
Attachment C |
Where in the permit are the minimum BMPs defined for Risk Level 2? |
Attachment D |
Where in the permit are the minimum BMPs defined for Risk Level 3? |
Attachment E |
What is considered good housekeeping? |
Tracking your inventory of BMPs & minimizing exposure of construction materials to rain and wind. |
What should be in your waste management narrative? |
Spill response plan, procedure to protect waste material, and list of equipment and materials for cleanup. |
What is generally wind erosion control? |
Use plastic tarp, unless more sustainable environmentally friendly alternatives exist. |
What is considered an inactive work area? (days) |
Areas not disturbed for 14 days. |
T or F: Sediment basins need a maintenance schedule. |
True. |
What should be in your waste management narrative? |
Spill response plan, procedure to protect waste material, and list of equipment and materials for cleanup. |