Practice Questions

Answers:
What should you do if the original SWPPP is not kepted at the construction site?

Copies of the BMP and maps/drawings shall be left with the field crew.

What is an REAP?

Rain Event Action Plan

T or F: Diverting Run-On water is an allowed BMP.

True. You can prevent stormwater contract with the construction site.

T or F: SWPPP needs to be implemented only during the defined rain season.

False, there is not defined rainy season as of Sept 2009

What are the five categories of year round BMPs?

Housekeeping, non-stormwater mgt, erosion control, sediment control, run-on/run-off controls.

Where in the permit are the minimum BMPs defined for LUPs?

Attachment A

Where in the permit are the minimum BMPs defined for Risk Level 1?

Attachment C

Where in the permit are the minimum BMPs defined for Risk Level 2?

Attachment D

Where in the permit are the minimum BMPs defined for Risk Level 3?

Attachment E

What is considered good housekeeping?

Tracking your inventory of BMPs
& minimizing exposure of construction materials to rain and wind.

What should be in your waste management narrative?

Spill response plan, procedure to protect waste material, and list of equipment and materials for cleanup.

What is generally wind erosion control?

Use plastic tarp, unless more sustainable environmentally friendly alternatives exist.

What is considered an inactive work area? (days)

Areas not disturbed for 14 days.

T or F: Sediment basins need a maintenance schedule.

True.

What should be in your waste management narrative?